Existing fleets
Register installed energy storage so end-of-life treatment is funded and contractually arranged before modules reach residual value or failure.
Access is for professional counterparties. Identify your company and email, and state what you require. Required once per browser.
Markets
Every producer or asset owner of an industrial battery or BESS above 2 kWh needs the Battery EPR Reserve. Stationary storage already in the field, projects about to be deployed, and ground-lease sites that also need restoration outside the Battery Regulation.
Register installed energy storage so end-of-life treatment is funded and contractually arranged before modules reach residual value or failure.
Build EPR cover into commissioning. The reserve sits in the Swiss structure, not with the EPC or a single recycling plant.
Where modules move into a second-use path, a new electronic record is required, linked to the original. The financial assurance still needs a defined end-of-life. LOOBA keeps that obligation executable.
Reach out
Tell us whether you need cover for an existing fleet, a new project, or end-of-life planning. Company name and email are required.
Paul Aalberts · Zug, Switzerland · paa@looba.eu